DTS, Inc./Lectrus

LOCATION: Tea, SD

New Construction – Design/Build This 33,000 SF manufacturing facility was designed and constructed in 6 months. Highlights include 40’ clear height “headroom”, 125’ clear-span roof, 26’ wide overhead doors, 60 ton crane that runs the entire footprint of the building, and in-floor electric radiant heat. Shaw Construction’s ingenuity was highlighted by the fact that the building shell has no interior support columns to maximize the crane coverage for economic and efficient design.


ADDITIONAL PICTURES